The Airspace Development Process

Our Architects and Engineers work to the current Building Regulation Standards and achieve outstanding results across the board, from conversions through to new builds and of course rooftop construction.

In the UK, planning regulations for airspace construction developments were updated to facilitate building upwards on existing structures. Permitted Development Rights (PDR) were Introduced in August 2020, these rights allow certain airspace developments without the need for full planning permission.

Criteria for PDR:

Even with PDR, developers must obtain prior approval from the local planning authority. This involves assessing the impact on transport, air traffic, and the external appearance of the building.

Environmental Considerations: The planning system also considers environmental impacts, particularly noise and air quality, especially near airports. Local authorities and the Civil Aviation Authority (CAA) play significant roles in regulating these aspects.

PDR allows homeowners and developers to add new storeys to existing residential buildings without needing full planning permission. This makes it easier and faster to expand living spaces, especially in urban areas where space is limited.

We liaise with our clients and specialised planners to ensure each development is viable.

We offer two types of construction for our developers:

  1. Standard Steel Frame/Brick Construction: Steel frames provide strong support and are often used for larger or more complex airspace developments. They can handle heavier loads and allow for more design flexibility, with a brick outer and standard roof.
  2. Modular Construction: This involves creating sections of the building off-site and then assembling them on top of the existing structure. It is efficient and can reduce construction time and disruption to the existing building.

Both Construction Models meet with current building regulations

Sales

Current Sales information can be requested via the contact button below